if you're wondering why is am not as often present on forums, here is the reason.

before:


work in progress:






i am busy with a complete renovation of a 3 story house. Originaly build in 1933, it was in poor condition.
I ripped out the complete interior, cieling and room separations, leaving only the bare constuction walls. Even the plumbing, electricity and central heating was completely ripped out and will all be renewed and modernised.

this  i just another of my "hobby" projects when i need inspiration or get bored ....
.

admin

June 17, 2015, 12:29:06 pm #1 Last Edit: June 18, 2015, 08:14:30 am by admin
what has been already done.
demolition:
- all room deviding removed
- all bathrooms and toilets removed
- all cielings removed
- all lead lumbing removed
- old lead sewer pipe removed
- old brick chimneys removed for 3 storys

rebuild:
- reconstructed main sewerpipe in crawlspace.
- reconstructed new main sewerpipe.
- repairing of all walls including where the brick chimney's was removed.
- placing electricity, water, gas and heating main lines.
-

glennf

July 02, 2015, 05:24:16 pm #2 Last Edit: July 02, 2015, 05:26:03 pm by glennf
This is :

i bought a 3 story house and stripped it bare to the 4 walls.
i am rebuilding all plumbing, electicity and room deviding to my own liking.

i am doing this as a hobby project together with my brother.

we "work" 4 days a week for 4 hours each on the house...

glennf

July 14, 2015, 11:32:27 am #3 Last Edit: July 14, 2015, 11:34:28 am by glennf
this was it before i started:




glennf


glennf


glennf

progress on 3th floor



Happy Reefing, GlennF.


glennf

The 3th floor is beginning to look like something


Before


Demolition works


Start plastering


Yesterday 9,4 meters plasterwork.



Happy Reefing, GlennF.

ammari33

Hope by now you completed the renovation of your house,  ;)

glennf

March 02, 2016, 07:31:09 pm #9 Last Edit: March 02, 2016, 07:44:35 pm by glennf
Update :
Plasterwork and wall/cieling painting finished.
now starting tileworks for toilet  and bathroom.



To do:

Finish toilet
Finish bathroom
Placing heating panels
Placing and connecting central heating and warm water system.
Start placing (under) floor panels.
Start placing kitchen
Placing ventilation for kitchen and bathroom on rooftop.
Mounting all doors
Several small finishing touch


Start with next floor.... 2 floors to go....





Happy Reefing, GlennF.